In October 2016, a few weeks after finishing the deconstruction, I started with the preparations for the rebuild.
The preparation stage of the House Muschamp project was expected to take at least one year; if not two.
In this stage I wanted to (A) save up for a deposit for buying land, (B) develop a construction strategy for the rebuild and (C) prepare deconstructed materials for the rebuild. All is done part-time; like the Muschamps did.

Land for sale?

I like to settle in the Tasman / Marlborough region (Top of the South Island) and plan to rebuild House Muschamp there.
Leaving Christchurch and moving into the area now, offered me the opportunity to get to know the area better and allowed me to orientate on availability and options for buying land. 

Engineering

It will not be possible to exactly rebuild house Muschamp as it was built originally. 
The plan is to develop a rebuild strategy incorporating feasibility, heritage, structural strengthening, building physics and appropriate building services. I'm looking into options to apply base isolation.
READ MORE

Preparing materials for rebuild

At this stage the focus for preparing construction materials is put on preparing the timber joinery for the rebuild.
Paint-stripping the ceilings requires research, and cleaning / preparing the Oamaru stones for rebuild will be done best on site (once there is a site)
READ MORE

Research

Various items require research; historical, architectural, technical, back ground information. Items researched are published in this category. George Barker Muschamp as Clerck of works at the Basilica, who were George Barker and Lorenzo De Castino Muschamp?
READ MORE